Home›Build flight hours
Build hours · 250 to 1,500

Building time to 1,500 hours, and the CFI question.

The commercial certificate leaves you at about 250 hours and the airlines want 1,500. Every realistic way to close the gap, what each one pays or costs, the order to try them in, and an honest answer to whether you have to instruct at all.

Checked October 17, 2026 · updated October 26, 2026 · How we verify
Bridging the commercial to the ATP · industry practice

The 1,250-hour gap.

Your commercial certificate gets you to about 250 hours (the Part 61 minimum under 14 CFR 61.129; 190 in an approved Part 141 course, Appendix D). The airlines want 1,500. How to close the gap affordably, and quickly.

The most expensive year of your career.

Full training, private through commercial multi and CFI, lands you at around 250–280 flight hours. The FAA requires 1,500 for an Airline Transport Pilot certificate, or 1,000–1,250 for the restricted ATP with college credit. The gap of 1,250 or more hours is the make-or-break phase of every aspiring pilot's career: how you close it decides how much you spend, how much you earn while you do it, and what kind of pilot you become.

Commercial minimum250 · 190Part 61 · Part 141
Restricted ATP1,000–1,250With college credit; 750 military (61.160)

Every realistic way to close it.

Best path 01 · net income +$25–50/hr × 60–90 hrs a month = $1,500–4,500 a monthCFI, CFII, MEI at your training school.

The classic and the best path. Get your CFI, get hired at your training school or a nearby one, and get paid to fly while you build: 800–1,200 hours a year in good conditions. Adding the CFII and MEI raises your hourly rate and shortens the time to 1,500.

Why it's the best: you are paid, you are flying, you are learning to teach (which deepens your own knowledge), and many schools have airline flow agreements. Most legacy airline captains started here.

Best path 02 · $41–48k base as a first officer plus load pay, $77–118k as a captain; fast turbine time, PIC after upgradeAmeriflight, or Part 135 cargo.

Ameriflight (the UPS feeder), Mountain Air Cargo (the FedEx feeder) and other Part 135 cargo carriers hire first officers from about 500 hours (Ameriflight: 500 total, 25 multi, 350 PIC, a CFI certificate) and captains from about 1,200. You fly turboprops (at Ameriflight: Beech 99s and 1900s, Metros, EMB-120s and Saab 340s; first officers $40,922 base in year one to $47,563 in year five plus load pay, captains $76,503 (Beech 99, year one) to $117,702 (EMB-120 or Saab 340, year twelve) by fleet and year, per its pilot page, re-checked October 18, 2026), which is turbine time in quantity: SIC as a first officer, PIC once you upgrade to captain. The UPS FlightPath II pipeline is here. Cargo builds high-quality hours fast and the pay is good; many pilots who start in 135 cargo stay in cargo for the schedule flexibility and the earnings.

Trade-off: night freight (3 am departures), small airports, weather-minimums challenges. It builds real-world IFR experience faster than almost any other entry-level job.

Best path 03 · net income $30–50k a year, and quality PIC timeBanner towing, traffic patrol, or aerial survey.

Banner towing pays $30–45k a year, traffic reporting and pipeline patrol $35–50k, aerial survey and photo $35–50k at entry (per the linked postings). All build solid single-engine PIC time fast, 700–1,000 hours a year, and the hours count toward the ATP. Often steam-gauge airplanes, which prepares you for the entry-level airline jobs.

Watch out for: some banner-tow jobs are seasonal (summer beaches); build a year-round plan. Some traffic-reporting jobs mix drone and helicopter flying: drone time is not pilot time and does not count; helicopter time counts toward the 1,500 total, the 500 cross-country and the 100 night, but not toward the 250 hours PIC and the 50 hours in class that must be in an airplane (61.159). Verify before accepting.

Alternative · net cost $55–100/hr × the hours you need = $40–80k out of pocketTime-building block programs.

Several schools offer shared-rate or block-discount time building: you and one or two other pilots rent a 172 together at a wet rate of $55–85 an hour and rotate as PIC. Programs at LowTimePilot, FlySharedAviation, The Flight School at Colorado Springs, and others. The cheapest way to log hours that does not require landing a job.

Trade-off: you are paying instead of earning. Best for pilots who cannot find a CFI job, or who want to fly more hours faster than a CFI job allows.

Alternative · net cost variable, $50–120/hr operating if you buyAircraft ownership, or a flying club.

Some career-focused pilots buy a used Cessna 172 or PA-28 for $40–80k, in cash or with two or three partners, fly it through the time-building phase, then sell it at the ATP. The net cost can be lower than renting if you fly 300 or more hours and the market holds. Flying clubs are the middle path: monthly dues ($75–200) and lower hourly rates ($60–110).

Risk: maintenance surprises, depreciation, insurance complications, and airworthiness directives, which recur and cannot be overflown. Not for the financially fragile. The flight school cost page has the full ownership arithmetic and the FAA's four buying steps.

FAA guidance The FAA's owner handbook is Plane Sense (FAA-H-8083-19A, 2008 edition, free; check the current rule where the cost page says so). Read Chapters 1, 2, 7, 8 and 9 before you shop: "Aircraft ownership is a serious undertaking", and the most common mistake is deciding too quickly. 1-1 (PDF p. 17) ↗ · 2-1 (PDF p. 37) ↗ · with partners, every co-owner signs the registration: 4-2 (PDF p. 52) ↗ · checked on October 26, 2026.

Skip these · higher cost than the alternatives, often slowerWhat to avoid.

Pay-for-training "career pilot" packages that promise everything from the private through the ATP for $150k or more, flat. They often skip the time-building phase entirely, leaving you at 250 hours with a commercial certificate and no plan to reach 1,500.

"Pay-to-fly" right-seat programs at small charter operators, where you pay them to fly as second-in-command: borderline scams. The FAA has scrutinized them and the time often does not count properly.

Helicopter-only time if your goal is the airlines: helicopter time counts toward the 1,500 total, the 500 cross-country and the 100 night (61.159), but the 50 hours in class and the 250 hours PIC must be in an airplane, and the airlines want airplane time; plan to add it, not to start over.

Source: hours: 14 CFR 61.129 (commercial, 250), 61.159 (ATP, 1,500), 61.160 (restricted ATP: 750 military, 1,000 bachelor's, 1,250 associate's), eCFR. Cargo and Part 135 minimums from the carriers' own pilot pages (Ameriflight, Sep 2026). Pay ranges are what operators post; they vary by year and region.

The honest priority order · Captain's take

CFI, then Part 135 cargo, then banner and survey, then block time.

Captain's take

Earning while you build hours is almost always better than paying to build them. If the choice is a CFI job at $30k a year or $40k out of pocket for block time, the CFI job is a $70k swing, even if the hours come a little slower. Find a job that pays you to fly. That is the entire game in this phase of your career.

A path most pilots don't know exists · Captain's take

Do you actually need to be a CFI?

The traditional path says commercial, then CFI, then instruct to 1,500. It is not the only path. The honest case for skipping the CFI, and the risks you have to weigh.

"You have to be a CFI to build hours" is wrong.

The CFI route is the most common path to 1,500 because it is predictable: students keep coming in, you fly a lot, you build steadily. That is why everyone recommends it. But common is not the same as optimal. Some pilots are better off skipping the CFI entirely and going from the commercial to a low-time pilot job to the airlines. The industry rewards pilots who customize their path; you do not have to do what everyone else does. You do have to understand the trade-offs first.

Path A · traditionalGet the CFI ratings, then build hours.

Private → instrument → commercial → multi → CFI → CFII → MEI → 1,500 hours → ATP → the airlines.

Total cost$92k
Months22–30
Earnings, year 2$30–60k

Why so many pilots do this:

  • Predictable hour-building: students keep needing lessons; you fly most days.
  • It pays you while you build: a $25–50/hr CFI rate × 60–80 hours a month.
  • It deepens your knowledge: teaching forces mastery of every concept.
  • The network: students who become airline pilots, recruiters who notice your work, other CFIs who flow to the airlines first and refer you.
  • School flow agreements: many CFI programs partner with regionals (ATP, US Aviation, Coast, Wayman and others) for advertised guaranteed-interview spots; terms vary by school and regional, so read the actual agreement before paying for it.

What to watch out for:

  • About $10–15k more in training for the CFI, CFII and MEI.
  • 3–5 months added to the timeline before you can start building hours.
  • Burnout: CFI work is mentally exhausting and the pay is modest.
Path B · skip the CFIGo straight to a low-time pilot job.

Private → instrument → commercial → multi → banner, survey, cargo or charter → 1,500 → the airlines.

Total cost$80k
To 1,500 hours2–4 yrs
Earnings, year 2 (per the ranges above)$35–55k

Why this can be smart:

  • $10–15k cheaper: no CFI, CFII or MEI tuition.
  • 3–5 months faster to start building hours.
  • Comparable or higher entry pay: banner tow, survey and patrol start around $30–55k, against the $30–60k a year an hour-building CFI earns ($25–50 an hour, 60–90 paid hours a month).
  • Diverse experience: turbine time in Part 135 cargo once you have the hours (Ameriflight hires from 500 but requires the CFI, so it belongs to the other path), low-altitude precision in aerial survey, real-world Part 135 in piston charter. Different skills than instructing.
  • The path is real: banner towing, aerial survey and traffic patrol hire pilots straight off the commercial multi at about 250 hours; Ameriflight's lowest-time seat is 500 hours total, 350 PIC, with a CFI certificate required.

What to watch out for:

  • Riskier: finding that first low-time job is harder than being hired as a CFI at your own school.
  • Seasonal: banner tow is summer-only in many regions; survey is weather-dependent.
  • No teaching credential: if you ever decide to teach, you add the CFI then.
  • Less networked into the airline pipelines: CFIs at the big training schools have easier paths to the regional cadet programs.
  • You can always add the CFI later, but it is a hassle if you decide you need it.
The honest call

The CFI route is traditional because it is safe: predictable income, steady hour-building, a clear next step. It is the most common choice and for many pilots the right one. But "most" is not "everyone." If you live somewhere with strong banner-tow, aerial-survey or cargo-feeder opportunities, if you already have a cargo-feeder or charter job lined up that does not require the CFI, or if you simply do not want to teach, you can skip the CFI entirely. The airlines do not require that your 1,500 hours came from instructing; a Beech 1900 freight run at 3 am counts just as well toward the ATP. What they weigh is the quality of the time: pilot-in-command hours, multi-engine and turbine time, Part 135 or 121 operating experience, which is exactly what those routes build. The certificate that gets you interviewed is the ATP. The CFI is one way to get there, not the only one. Don't let conventional wisdom narrow your options before you have considered them.

About these paths

Both are well travelled by real pilots; neither is universally better. The right choice depends on your geography (banner-tow and survey opportunities vary by region), your finances (the CFI route has lower up-front earnings but predictable income; the alternatives can pay more but take more job hunting), and your personality (some pilots love teaching; others hate it). Talk to working pilots on both paths before deciding. If you would like to be connected with pilots on either path, reach out; we are building a mentor-matching network.

Source: instructor pay and hours-per-year figures are ranges from school postings and instructors' reports, not a survey; treat them as a pattern.

If you do want the CFI · the accelerated option · Industry practice

American Flyers' 30-day CFI academy.

If you have decided you want to instruct and you want it done fast and at a known price, this is the industry's best-known accelerated CFI program.

Run since the 1990s, it combines 104 hours of classroom instruction with 10 hours of one-on-one ground and 14 hours of dual flight time, finished in 30 calendar days, and it includes both the CFI and the CFII. The advantage is a structured, group-based program with high pass rates, unlimited simulator time, and an established teaching framework. It is cost-effective against doing the CFI at your local school, which usually runs $10–15k spread over 3–5 months with lower first-time pass rates. Six schools in four states: New Jersey, Florida, Texas and Arizona (americanflyers.com, checked October 26, 2026).

A disclosure first: I did my own training, instrument through CFII, at American Flyers, and recommends it on that experience. The Judith Resnik Memorial Scholarship, named for the Challenger astronaut, supports women pursuing the CFI through this program; the terms and amount are on American Flyers' scholarship page and change year to year.

Two ratingsCFI + CFII
Classroom104 hrs